Improvement Vail to Georgetown
Updated traffic flow and crossings
Trail improvements from imagery, GPS tracks, and on-the-ground video footage
Re-routed trail through Shoshone based on ground-level videos and Strava GPS tracks
Road was straightened about 10 years ago.
Added new bank and adjusted shared use path
Major work on Argentine Street (new roundabout, path, sidewalks, etc.)
Realigning bridge after reconstruction
Signed access to river trail through business/parking lot
Adding roughness tag to prevent bicycle routing through this dangerous track
Removing structures from school prior to recent rebuild
New driveway alignment after rebuild of the school
Canal Access Road improvements/connections
Warrenton/Gearhart surface updates
Surface updates around Astoria
LCN has been from the hillside to a newly constructed off-street concrete path
Improvements north end of Bergen Park, new crosswalk/path, additional connections
Corrected LCN path to move it off the street and onto the adjacent cycle path